About True North Mechanical

True North Mechanical is a London based company who has proudly worked on and
contributed to many successful projects in the construction industry throughout London and the South East.

Get in touch

Covering London & the South East

07857 291239

enquiries@truenorthmech.co.uk

 

Projects

Recent Projects

Sheepcote - North London - T4 M&E

April 2023 - December 2023

Plant room, Tank room and infrastructure shell & core pipework serving 145 residential units across 2 blocks. Mild steel installed with prefabricated pipework / Screwed pipework. Soldered / Brazed copper

New Road Triangle - Feltham - T4 M&E

Jan 2023 - TBC

Plant room, Tank room and infrastructure shell & core pipework serving 177 residential units in 2 blocks. Mild steel installed with prefabricated pipework / Screwed pipework. Soldered / Brazed copper. ASHP system with ambient loop feeding multiple smaller heat pumps throughout the building.

Chatham Waters - Chatham - T4 M&E

Jan 2023 - July 2023

Tank room and BCW infrastructure to 237 residential units. Soldered and brazed pipework.

City of London Freemen's School - Ashtead - City of London

Ongoing

Working directly with the school to find solutions to various plumbing and heating issues throughout the facility's many buildings. Supply and installation of plumbing and heating items as per work order request from the school.

Holbein Offices - Sloane Square - Briggs & Forrester

July 2022 - Present

6 Story office block with multiple toilet cores. All plumbing / heating, first and second fix completed by our team. ASHPs located on the roof placed and piped by our team.

Croydon CLE - Croydon - Briggs & Forrester

Jan 2022 - July 2022

2 large assembly warehouses which specialize in making ventilators and medical equipment. All plumbing, heating, medical gas pipework completed by us. Complexe medical gas / compressed air system serving 160 points for multiple assembly areas and work benches.

Town Hall - Hammersmith - Grove Mech / ESS Ltd.

Jan 2022 - Present

All plumbing, heating, and chilled services to serve the new renovation of the Grade 2 listed building in the center of Hammersmith. 150 FCUs hung and piped, 160 WCs, 155 Radiators, 50 Chilled Beams, multiple plumbing fixtures throughout. Complete package of works including all infrastructure, first and second fix plumbing. Supervision included for the project by TNM.

Pegasus Life - West Byfleet - T4 Mechanical

July 2022 - Present

Plant room, tank room, infrastructure pipework to serve 88 residential units. ASHPs to act as the heat source, placed and piped by our team.

The Berkely Hotel - Hyde Park - Grove Mech / Stothers M&E

Nov 2021 - Present

Plant room and infrastructure pipework to serve 9 floors as well as the 4 sub-basement floors. Includes connections to 150 FCUs. All pipework in pressed copper, screwed / prefab iron.

12 Penn Street - Hoxton - Briggs & Forrester Special Projects

April 2021 - Present

33 unit high spec residential build including 2 large commercial areas. We are completing all plumbing, heating and gas throughout the project.

Cobham Retirement Living - Cobham - T4 M&E

Jan 2021 - Present

55 high spec retirement apartments including central plant room and infrastructure throughout. We are completing all domestic, heating, and gas works on the project.

Laser House - Farringdon - Michael Nugent M&E

Dec 2020 - Dec 2021

Large office block renovation consisting of 7 stores, 2 toilet cores per floor. Plant room and tank room, all first and second fix plumbing. Prefab/welded/screwed steel, soldered/brazed domestics.

Orchard Wharf - Canning town - T4 M&E

June 2020 - Sept 2020

Centralised plant room, tank room and car park distribution serving 355 residential units. Hamworthy boilers, SAV CHPs, prefab/screwed steel, soldered/brazed copper. Our package consists of all works within the plant room, tank room and car park area, leaving a flushing bypass at the base of each riser for others.

City of London School - Ashtead - Michael Nugent M&E

June 2020 - March 2021

Renovation project on a 300 year old listed stately home. All plumbing and heating works including central plant, tank toom, LTHW CT & VT circuits, SVP & RWP, as well as all first and second fix plumbing. Prefab/screwed steel, Viega press copper, Rehau Plastic within wood floors.

Chatham Waters Residential Build - Chatham - T4 M&E

Sept 2019 - Feb 2020

Install of BCW distribution pipework to serve 200 residential flats. Large tank room and infrastructure pipework across a car park, along with both SVP and RWP systems installed underslung in the car park in HDPE fusion weld. Pipe systems included brazed copper and fusion welded HDPE.

Big Creative Academy - Walthamstow - Briggs & Forrester

March 2020 - Sept 2020

Adult education center spread over 3 stories, with a community cafe. Plant room, tank room, and all pipework and valve setups serving 60 FCUs, multiple AHUs, and radiators. Plumbing first a second fix to serve multiple bathroom groups, kitchen areas, and additional plumbing fixtures. Underground incoming gas and water services installed and tested. Pipework systems used are a combination of pressed, screwed, prefab and welded.

Blythe Road Residential Build - Hayes - T4 M&E

Feb 2020 - Oct 2020

Infrastructure pipework throughout the project to serve all residential units. LTHW pipework consisting of welded, prefab, victaulic and screwed steel. BCW pipework is a combination of brazed and soldered copper. Energy Center done completely with Victualic piping system.

Horton Road Residential Build - West Drayton - T4 M&E

December 2019 - Sept 2020

88 flats throughout 3 blocks for which we are installing all first and second fix plumbing systems. Includes 3 tank rooms with BCW distribution to all flats and a large car park of cast iron drainage. GasTite CSST lines to each flat to serve a combi boiler.

Aconex Residential Build - Barbican (April 2019 - Feb 2020) - William Coates

December 2019 - Sept 2020

100 flats which for us includes plant room, tank room, all infrastructure pipework and hanging HIU’s and hooking up primarys. This project consists of screwed barrel and welded LTHW pipeworks.

109 Station Road Residential - New Southgate - T4 M&E

Feb 2019 - June 2020

Secured project for all plumbing works including tank room, distribution pipework, gas services, and all flat internals.

Layden House Office Block - Farringdon - Michael Nugent M&E

June 2019 - Mar 2020

7 Story office block for full plumbing and pipefitting package. This project includes the installation of all RWP, SVP, approximately 60 toilet cubicles, kitchen sinks, Doc M’s, and some electric rads.

Residential Build - West Green Place - T4 M&E

Mar 2019 - Feb 2020

110 Flats of distribution pipework. LTHW, BCW and CAT 5 throughout 4 blocks of flats. Also includes a plant room and tank room.

Office Block - King Cross St. Pancreas - Briggs & Forrester

October 2018 - May 2019

Secured project for the install of all plumbing and pipefitting services in a 6 story office block in central London.

Residential Build - West Drayton - T4 M&E

July 2018 - Aug 2018

Large network of underslung cast iron SVP and RWP to serve 6 blocks of flats, we have currently won the first 3 blocks and are looking to secure the rest of the project shortly. Cast iron from 110mm to 300mm.

Nutifix Office Renovation - Reading - RED ME

July 2018 - Aug 2018

Relocation of 22 FCU’s, new kitchen area, and water points throughout.

Colliers Wood Residential Project - T4 M&E

April 2018 - March 2019

Won the entire project for plumbing, pipefitting and supervision. Includes tank room, gas lines to serve 34 units, all distribution, and all flats first and second fix.

Volkswagen Dealership - Battersea - RED ME

March 2018 - Sept 2018

All Plumbing and infrastructure throughout the building, including plant room, tank room, LTHW, CAT 5, BCW and HWS to serve all fixtures, rads, and FCU’s. We also will be installing all sanitary ware as the project nears completion. 54mm gas line to serve the plant room and 6 radiant tube heaters, installed, tested and purged.

Ashton Court - Camden Town - T4 M&E

February 2018 - Present

All distribution pipework throughout small residential build to serve 24 units.

Lion Wharf - Isleworth - T4 M&E

November 2017 - March 2019

Plant Room, Tank Room, All distribution throughout car park, risers and laterals to serve 139 residential units. Included a 150mm steel gas line that we installed, tested and purged. Later on in the project we won a large network of drainage throughout the basement, as well as all of the external RWP serving all balconies.

145 City Road - Shoreditch - T4 M&E

September 2017 - Feb 2018

All distribution pipework to serve 132 Residential Units. 200mm pre-fab steel riser, Geberet Press / soldered distribution.

Rams Brewery - Wandsworth - T4 M&E

July 2017 - September 2017

All distribution pipework including LTHW, CHW, and BCW to serve 24 flats.

Moberly Leisure Center - Kensal Rise - T4 M&E

April 2017 - Nov 2017

All distribution pipework throughout the building serving 64 flats. Large network of drainage pipework throughout the transfer area from 54mm to 30mm HDPE fusion weld.

Star & Garter Renovation - Richmond - Haydon M&E

Nov 2015 - March 2017

Corridors and distribution work for LTHW, CHW, and BCW. 1st fix of flats, including pipework for HIU’s. Screwed barrel, victaulic, soldering, brazing, Mega-Press/Viaga-Press.